Gallery

Building for hotel and sports purposes

Dariaus ir Girėno St. 23, Vilnius

The existing administrative building and part of the existing industrial building are being reconstructed into a five-story hotel. The remaining western part of the industrial building will be converted into a sports facility. In addition, a newly designed and constructed one-story, rectangular sports building is planned.

The reconstructed sports facility will house a swimming pool and sauna area, while the newly constructed sports building will be dedicated to a tennis court.

On the ground floor of the hotel building, along the northern façade of Block A, commercial premises are planned with direct access from the outside. The rest of the ground floor of Block A will accommodate a reception area, a restaurant serving guests of the hotel, swimming pool, and tennis court, as well as other hotel service areas. Short-term accommodation rooms of various sizes will be located on the 2nd to 5th floors of Block A and the 1st to 4th floors of Block B.

  • Area of the reconstructed sports building: 1,543 m²
  • Area of the hotel building: 4,968 m²
  • Area of the commercial premises: 84.85 m²
  • Area of the newly constructed building: 3,521 m², of which the sports hall occupies 2,971 m²

 

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.